Location: RhodesOwner: Municipality of RhodesBudget: 2.000.000 €Assignment: 2007 The scope of the project was the construction of a 140 m by 15 m steel building, which stages a gym and locker rooms. The extension of the roof of the building is used as the roof of the...
by cntlp | January 24, 2019
Location: SimiOwner: Municipality of SimiBudget: 3.000.000 €Duration: The scope of the project was the construction of the 1500 m² public gym of Symi with a 700 m² court, locker rooms and a cafeteria. The roof is made of wood beams and covered with tiles. ALL...
by cntlp | January 24, 2019
Location: EgaleoOwner: Region of AtticaBudget: 5.100.000 €Duration: 20/05/2013Assignment: 16 Months The scope of the project was the reconstruction of about 3 km of Thivon Avenue, from Petrou Ralli Street up to Athinon Avenue. The curbes were replaced and the...