Gemini, Corfu

Gemini, Corfu

Location: CorfuOwner: Οmonoia S.A.Budget: 2.000.000 €Duration: 4 MonthsAssignment: 2018Renovation of rooms, facades and exteriors of 123-room Gemini hotel. Renovation of a 165m² swimming pool and construction of new 25m² children’s swimming pool. ALL...
Sermilia, Chalkidiki

Sermilia, Chalkidiki

Location: ChalkidikiOwner: Hotel Filippio Psakoudia S.A.Budget: 6.200.000 €Duration: 12 MonthsAssignment: 14/01/2014 The scope of the project was the full reconstruction of the hotel and its conversion into a 5-star unit. After demolitions, the preexisting reinforced...
Central, Athens

Central, Athens

Location: AthensOwner: Dimitriou BrosBudget: 300.000 €Duration: 3 monthsAssignment: 2019The scope of the project was the renovation of the Terrace bar of Central Hotel.After the dismantling of the existing elements new walls and ceilings with backlights ,new bar and...
Hapimag Damnoni, Rethymno Crete

Hapimag Damnoni, Rethymno Crete

Location: Rethymno, CreteOwner: Hapimag Hellas S.A.Budget: 2.300.000 €Duration: 6 MonthsAssignment: 31/07/2008 The scope of the project was the renovation of the 1,500 m² public spaces of the hotel, including the floors, the ceilings and all electromechanical...
Rodos Palace, Rhodes

Rodos Palace, Rhodes

Location: RhodesOwner: Rodos Palace Hotel Α.Ε.Budget: 1.200.000 €Duration: 6 MonthsAssignment: 29/04/2006 The scope of the project was the renovation of 7 apartment buildings, consisting of 25 apartments each. It includes replacement of all the floors, ceilings,...